Once you've marked out the working lines on the substrate, you can commence the laying process.

Before you start:

  • double-check that the floor is completely clean and free from any contaminants

  • re-mark the chalk lines with a pencil, if necessary

  • make sure that tiles of the same colour have a matching batch number if they're being laid in the same room.
hearing icon
Image for slide 2
Audio for slide 2 (mp3 |6|KB)
The field tiles should always be laid first, because the border tiles will need to be cut and fitted to the wall before you can lay them.

In practice, it's easiest to leave the last two rows of tiles till last - that is, the last full tile and the border tile.

This will let you use the full tile to trace and cut the border tile - we'll discuss this process in the next lesson.

hearing icon
Image for slide 3
Audio for slide 3 (mp3 |6|KB)

To lay the field tiles, working from the centre of the floor:

  1. Spread the adhesive with a trowel, two tiles wide on one side of the long working line

    Start at the intersection of the two working lines.

    Make sure you only spread as far as you can comfortably cover with tiles during the 'open time' - maybe 2-3 m2 at a time.
hearing icon
Image for slide 4
Audio for slide 4 (mp3 |6|KB)
  1. Allow the adhesive to reach a slight tack, and then position the first tile at the starting point and check its alignment.

    Add two more tiles in the direction of the end wall and carefully check their alignment against the working line.

    Lay more tiles until you get to the end of the spread adhesive.
hearing icon
Image for slide 5
Audio for slide 5 (mp3 |6|KB)
  1. Spread more adhesive, this time in the direction of the side wall, two tiles wide. Lay two rows of tiles over the spread adhesive. Continue to build up the floor in alternate directions, two rows at a time.

    At this stage, don't lay the last full tile and part tile around the walls, or anywhere else where tiles will need to be cut.

    Wipe off any excess adhesive with a damp cloth if it has oozed up between the tiles. Roll the installed tiles in both directions with a roller.
hearing icon


Learning activity

Audio 6 (mp3 |6|KB)

Pick up where you left off with the Armstrong 'Vinyl tile installation' video (Part 3) at:

Vinyl installation videos

Watch the video from 2 min 10 secs to 3 min 10 secs. Then answer the following questions.

  • What size notches does the narrator say is best for spreading adhesive for VCT tiles?

  • How is the drying time for pressure sensitive adhesive different from drying time allowed for sheet vinyl products?

  • You'll notice that the tiles are laid in a slightly different order from the procedure described in this lesson. The pattern being demonstrated is called a 'pyramid' layout. How is it different from the method described above?
hearing icon