Assignment
Your trainer may ask you to complete this assignment as one of the assessment requirements for this unit. For more information about the assessment process and advice on what to do if you need help with your reading and writing, click on the link below.
- Loose lay installation:
- What types of floors or rooms are most suitable for a loose lay installation?
- What types of floors or rooms are not suitable?
- How big should the gap be around the perimeter of the floor?
- What is the purpose of the gap around the perimeter?
- What are the risks with using double-sided tape to secure seams and joins?
- Full spread installation:
- What is the difference between 'open time' and 'working time' in an adhesive?
- How can you tell when an adhesive has 'tacked up'?
- What is the purpose of the notches in a notched trowel?
- Why does the floor need to be rolled after it's laid into the adhesive?
- Name three potential problems you should look out for when you're inspecting a flooring installation that's just been completed. For each one, state what you could do to rectify the problem if it had occurred.
Doc (408 KB) Laying techniques Assignment template
Click on the link above to go to the Word document you will need to complete. You should fill in your answers on-screen and then either:
- print out a hard copy to send to your trainer by post
- save the file electronically to submit to your trainer as an email attachment.
Go to Just for fun