Home
- Working sustainably - Resources used at work
Timber strip flooring
Materials used in the installation:
strip flooring - as specified by the client
timber battens - to fix to the concrete subfloor
plastic sheeting and duct tape - to install the vapour barrier
flooring nails and concrete nails - for fixing the strip flooring and battens
construction adhesive - for gluing the flooring to the battens.
© Commonwealth of Australia 2014
Acknowledgements
Disclaimer
Copyright